Edwardian end terrace, draught proofing, damp, heating system, solar hot water, attic conversion, kitchen extension and cycle store.
Combi v system boiler; what are the benefits of installing a hot water storage cylinder?
Site appraisal A preliminary site investigation of Fairfield
Road was undertaken Thursday, 12th April, 2007, to make recommendations
with regards air tightness, insulation, replacement of french doors,
new gas boiler, underfloor heating and potential attic development. The
findings of our investigation were
documentend and published in site appraisals.
Read more...
Combination v's
system boiler?
Which is most efficient at providing hot water, a combination or a system boiler?
It could be argued that storing water at high
temperatures over
extended periods in a cylinder used heated by a system boiler would
increase energy losses; however greater inefficiencies are likely to be
caused by inappropriate design, poor control and usage, and inefficient
installation of either system. Each system when applied appropriately
has its merits. On a like for like layout, with like for like usage,
there's little to choose between them.
Read more...
Agenda
During our site meeting, [insert date] the following agenda of works were proposed.
- Heating system.
- Kitchen extension.
- Cycle store.
- Attic conversion.
Worster Bosch
The following list represents a brief introduction to the
maincomponents require for the installation of a new heating system for
thepurposes of evaluating system options. All prices are subject to VAT
@17.5%
Recommendations:
Worcester Bosch Greenstar 24i System boiler.
£ 814.00
Worcester bosch Greenstar 24i Junior Combi boiler.
£ 767.00
Worcester Bosch DT20 Twin channel digital programmer.
£ 47.00
Worcester Bosch Vertical flue adaptor kit.
£ 29.00
Worcester Bosch Vertical flue kit.
£ 82.00
Other
components estimated include: Zone valves, auto air-vents,elbows, tees
and pipe etc, roof flashing kit, condensate pipe and limescale
inhibitor.
£ 600.00
Optional:
Worcester Bosch Greenskies unvented solar cylinder.
1281mm 180 litres £ 1131.00
1469mm 210 litres £ 1161.00
1719mm 250 litres £ 1229.00
2032mm 300 litres £ 1314.00
Worcester Bosch Greenskies FKT-1S solar water heating system. Can supply 50-70% of the hot water used every year.
£ 1786.80
Additional
Enquiry:
I'm looking to source a boiler for a client who would like to install a
combination boiler and possible install solar at a later date. Rather
than converting the combi to a system they would like a boiler that can
except pre heated water from a storage cylinder installed later with
the solar panels. Do you have a suitable boiler available for the
British market?
Response:
Thank you for your email. None of our combination
boilers are approved for use with solar. The issues of legionella
control and scalding have yet to be addressed.
Regards, Technical dept.vaillant
Enquiry:
I'm looking to source a combination boiler and install solar at a later
date. Rather than converting the combi to a system I'd like a boiler
that can except pre heated water from a storage cylinder installed
later with the solar panels. Do you have a suitable boiler available
for the British market and what control measures are available with
regards legionella control and scalding?
Responce:
Thank you for your interest in Ravenheat Products. A suitable boiler
for use solar panels would be our CSI120 or CSI150. With regard to
legionella control and scalding these are matters that would be dealt
with by your system designer.
Regards, Ravenheat
Cycle store
1. Design and planning
2. Excavation
Waste transfer
All waste will be appropriately separated on site for reuse where
possible or transfered for recycling. This cost will be included in our
quotations / budget estimates.
McCarthy waste management
Sussex St
Bristol,
BS2 0RA
www.mccarthywaste.co.uk
McCarthy waste management, based in St Philips are central and
convenient for both bulk collection and accept deliveries of small
volumes of separated waste.
Contact: Kevin Mcdonagh 01179412555
Fee structure: 2008 rates have been requested
A quotation / budget estimate for waste transfer requirements will be included per section as specification is agreed.